Academia.eduAcademia.edu

Reported estimates represent the average + standard deviation (20) of values (n> 1) using different couples. Values for n=1 refer to a single couple. n: number of couples used for calculation. Calibrations: EG: Ellis and Green (1979); K: Krogh (1988); Ai: Ai (1994); P: Powell (1985); R: Ravna (2000); GP: Graham and Powell (1984); Pe: Perchuck et al. (1985); Ply: Plyusnina (1982); HB: Holland and Blundy (1994); CF: Colopietro and Friberg (1987); GS: Ganguly and Saxena (1984); PL: Perchuck and Lavrent'eva (1983); KR: Kleemann and Reinhardt (1994).  T and P estimates for the eclogites (RO380 and RC0611) and host pelitic schist (227)  Table 6

Table 6 Reported estimates represent the average + standard deviation (20) of values (n> 1) using different couples. Values for n=1 refer to a single couple. n: number of couples used for calculation. Calibrations: EG: Ellis and Green (1979); K: Krogh (1988); Ai: Ai (1994); P: Powell (1985); R: Ravna (2000); GP: Graham and Powell (1984); Pe: Perchuck et al. (1985); Ply: Plyusnina (1982); HB: Holland and Blundy (1994); CF: Colopietro and Friberg (1987); GS: Ganguly and Saxena (1984); PL: Perchuck and Lavrent'eva (1983); KR: Kleemann and Reinhardt (1994). T and P estimates for the eclogites (RO380 and RC0611) and host pelitic schist (227) Table 6