Skip to content

Conversation

@P1llus
Copy link
Member

@P1llus P1llus commented Jun 1, 2021

What does this PR do?

Updates package ECS version to 1.10.
Sync module changes to packages if any.
Adds Preserve Raw event functionality if not already exists.
Adds pipeline tests if missing.

Checklist

  • I have reviewed tips for building integrations and this pull request is aligned with them.
  • I have verified that all data streams collect metrics or logs.
  • I have added an entry to my package's changelog.yml file.
  • If I'm introducing a new feature, I have modified the Kibana version constraint in my package's manifest.yml file to point to the latest Elastic stack release (e.g. ^7.13.0).

Related issues

@elasticmachine
Copy link

Pinging @elastic/integrations (Team:Integrations)

@elasticmachine
Copy link

Pinging @elastic/security-external-integrations (Team:Security-External Integrations)

@P1llus P1llus marked this pull request as draft June 1, 2021 12:49
@elasticmachine
Copy link

elasticmachine commented Jun 1, 2021

💚 Build Succeeded

the below badges are clickable and redirect to their specific view in the CI or DOCS
Pipeline View Test View Changes Artifacts preview

Expand to view the summary

Build stats

  • Build Cause: Branch indexing

  • Start Time: 2021-06-09T22:28:41.383+0000

  • Duration: 16 min 16 sec

  • Commit: bcb2caf

Test stats 🧪

Test Results
Failed 0
Passed 82
Skipped 0
Total 82

Trends 🧪

Image of Build Times

Image of Tests

@P1llus P1llus marked this pull request as ready for review June 7, 2021 11:31
@mtojek mtojek requested a review from narph June 9, 2021 13:52
@P1llus P1llus merged commit 1131a3a into elastic:master Jun 10, 2021
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

7.14 candidate enhancement New feature or request Integration:iis IIS Team:Integrations Label for the Integrations team

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants